features: phases and processes
| details
|
---|
hierarchical work breakdown structure
| projectnetworld supports the structuring of a project in phases, processes, milestones, deadlines and to-dos and can be easily adapted to company-specific requirements and standards.
|
---|
WBS code
| The WBS code (work breakdown structure code) shows the levels of the project structure.
|
---|
logical links (dependencies and constraints)
| Processes can be assigned to phases. Milestones, in turn, represent significant interim goals in processes. (Scheduling) dependencies and constraints in the links can be taken into account and individually configured. |
---|
phase, process and milestone planning
| The following planning results are possible, for example: phases for the presentation of the rough overview, processes for a detailed sequence planning, milestones in a milestone plan, to-dos for the participant-related processing of tasks. These different elements can each be used alone or combined with each other as desired. |
---|
resource planning
| In the personal workspace of the project member, all tasks that have been assigned to him/her are clearly displayed. The possibility of feedback on the status provides an up-to-date picture of the degree of completion or progress of individual tasks. |
---|
resource utilization
| By assigning project members to individual tasks, a resource-specific work calendar is created that shows the current workload of individual project members. |
---|
effort planning
| The option ” Effort planning enabled ” allows to enter the planned hourly effort for each resource of an operation. (What is the planned hourly workload of this resource until the completion of the process?) |
---|
progress calculation
| Progress calculation can be done manually or based on a schedule.
|
---|
automatic vs. manual planning
| There are two ways of planning process: automatic planning or manual planning. |
---|
penalties
| Define deadlines (penalties) for time-critical process or test steps (milestones). A reminder function supports you in meeting and easily tracking deadlines as well as due test steps. |
---|
link to to-dos
| To-dos can be assigned to a process or created independently of the schedule.
|
---|
list and GANTT view
| Switch between list or graphical view at the push of a button. Entries can be changed e.g. more easily via grid edit in list view, the changes are immediately applied in the graphical view. Usability is also a top priority here and functions such as drag & drop have been integrated. |
---|
critical path indicator
| Various sorting and filter options enable a user-specific perspective on different project situations (e.g. delayed processes). Colors and symbols support the display of certain criteria (e.g. critical path). Reports also provide an up-to-date overview of the status of the project.
|
---|
drag and drop
| Extensive drag and drop as well as direct editing options significantly increase usability for users.
|
---|
quick edit of process lists
| Process lists can be quickly adjusted with the quick edit function.
|
---|
localization (time zones)
| Our localization function is particularly useful for global project teams – you get your appointments localized by location and thus automatically adjusted to your time zone.
|
---|
standard reports
| Generate status reports and automatic task lists at any time that can be exported as PDF or Excel files. The following standard reports have already been stored systemically: Late Tasks, Due Tasks, Resource Utilization, Overloaded Resources, Scheduled Tasks. |
---|
import from other systems
| We are open to other systems – Import of any file types and file sizes is supported. Documents can be uploaded simply by drag and drop. For larger files, project structures from alternative systems or multi-document uploads, we recommend bulk import via ZIP upload or we offer upload as a service. Note: MS Project and XML import are supported. |
---|
extended filter options
| Numerous freely configurable filter options enable processes to be found or sorted quickly. In this way you keep track of your projects and you can set, for example, only tasks in a certain phase, only tasks assigned to certain people or only all delayed tasks to be displayed.
|
---|